The summer of 2020 is expected to be one of the warmest ever on record. The job we are supplying is a power floated floor and with temperatures exceeding 30 Degrees Celsius, there is a potential for the concrete to 'go off' before it can be finished. Therefore, the customer required us to arrive on site at 5am. Starting early enabled us to supply over 350m3 by 2pm, this meant the concrete was supplied before temperatures started to peak in the Afternoon.